Interim Consolidated Financial Statements for the six month period ended 31 March 2023

02 June 2023

The Company is pleased to announce its Interim Results for the six-month period to 31 March 2023.

Electronic copies of the report will be available at the Company’s website www.blencoweresourcesplc.com

For further information please contact:

Blencowe Resources

Sam Quinn

www.blencoweresourcesplc.com

Tel: +44 (0) 1624 681 250

[email protected]

Investor Enquiries

Sasha Sethi

Tel: +44 (0) 7891 677 441

[email protected]

Tavira Securities Limited

Jonathan Evans

Tel: +44 (0)203 192 1733

[email protected]

First Equity Limited

Jason Robertson

Tel: +44 (0)20 7330 1883

[email protected]

 

Interim Management Report

 

The period to 31 March 2023 (and subsequent events to 30 April 2023) have seen the Company continue to develop its Orom-Cross graphite project. 

A Definitive Feasibility Study (“DFS”) commenced and is underway on a number of fronts; this is expected to take around 12 months to complete but the timing is dependent on pre-qualification test work being completed as a means to ultimately deliver binding offtake contracts for the full quantum of graphite concentrate being considered for sale under the phase one operational model.  Experienced Australian engineering firm CPC Engineering have agreed to manage and sign off on the DFS, and their experience and involvement will assist greatly in achieving a high quality study and result.

DFS work will concentrate on three key areas.  Firstly, work in-country to complete all work necessary to build and operate the mine, including all remaining licenses and permits. The associated infrastructure required to drive the operation will be scrutinised and plans put in place to ensure that all necessary infrastructure will be ready and in place for mining at Orom-Cross.  Local studies include management and personnel, mining, equipment, logistics and other key areas.  The DFS will take these studies to a far greater extent than the PFS in 2022.

Secondly, pre-qualification testing is taking place in the United States and China to advance the status of Orom-Cross graphite to potential buyers.  A bulk sample of 100 tonnes was mined from Orom-Cross in January and (via a special export permit) was approved for transport to China by sea, where it will be put through an existing graphite pilot testing facility.  This will save Blencowe substantial time and money by not having to build its own pilot facility on-site to get pre-qualified.  The resultant tonnes of 96% concentrate will be then processed to a series of 99.9% products, both expendable’s (large flakes) and SPG (spheronised, purified graphite) (smaller flakes).  Assuming successful these samples will be given to end user OEMs to conduct their own testing in their own facilities, to ensure Orom-Cross end product meets their standards and expectations.  Once this process is completed then Orom-Cross becomes ‘qualified’ and offtake contract discussions may be entered into. 

A 150kg sample was sent to China by air as a preliminary raw material product for the same pilot facility to run tests on how to achieve the best results on the larger sample to follow, and the Company expects feedback on this shortly.  This full qualification process is what sets graphite apart from most other metals and it also creates barriers to entry for new participants in the industry.  Blencowe is confident that it has the right process/procedures in place to achieve the results it requires to pass this key hurdle.  Without binding offtake agreements, it will be difficult to deliver a decision to mine and/or project funding, so this is a critical path item within the DFS.  In the past this process has taken other graphite companies several years, Blencowe is hoping that the refinement of this process via its advisors will ensure we ultimately complete this pre-qualification much faster.

In parallel Blencowe is conducting further metallurgical test work in USA to provide evidence (bench-scale testing) that the 96% concentrate it will deliver at Orom-Cross will be suitable for upgrading to the 99.9% end products sought after by the market, and how this us best achieved.  These results are expected soon and will be important in ascertaining the end value within the project portfolio.

Thirdly, Blencowe is working through a number of different potential funding options to secure the right partnerships for funding both the DFS and the project implementation.  There are different alternatives at both topco and project level and it is important that the right relationships are built that can deliver this project ahead, both now (DFS stage) and in building the full project.  Blencowe announced in April its successful passing through a key screening hurdle/test with the Development Finance Corporation (DFC) which is a tier one US Govt-owned financial institution which provides funding solutions for the private sector in areas the US Govt deems are critical.  Graphite is considered critical and hence the interaction.  This is seen as a valuable relationship for Orom-Cross and the Company is hoping to sign off on a substantial technical assistance grant with the DFC in the near term that will provide up to 50% of the DFS costs.  Thereafter this relationship has the potential to offer further funding solutions for the full project finance required.  The credibility that association with an institution of this stature brings to both our Company and our project cannot be easily measured; this would be a big result for Blencowe.

These and other DFS activities are the focus and will remain so for the Company ahead.  Further capital will be introduced into the Company as and when required, with the continued support of our major shareholders, and once Blencowe delivers the DFC technical assistance grant it is believed that many other funding opportunities will emerge at all levels.

Elsewhere, the Company walked away from the previously announced nickel exploration earn-in deal with SIPA Resources as it was considered more advantageous to concentrate on delivering the Orom-Cross graphite project into production ahead.

 

Mike Ralston

Chief Executive Officer

 

Responsibility Statement of the Directors in respect of the Interim Report

The Directors are responsible for preparing the Interim Financial Statements in accordance with applicable law and regulations. In addition, the Directors have elected to prepare the Interim Financial Statements in accordance with International Financial Reporting Standards (“IFRSs”), as adopted by the United Kingdom (“UK”).

The Interim Financial Statements are required to give a true and fair view of the state of affairs of the Group and of the profit or loss of the Group for that period.

In preparing these Interim Financial Statements, the Directors are required to:

  • select suitable accounting policies and then apply them consistently;
  • present information and make judgements that are reasonable, prudent and provides relevant, comparable and understandable information;
  • provide additional disclosures when compliance with the specific requirements in IFRS is insufficient to enable users to understand the impact of particulars transactions, other events and conditions on the entity’s financial position and financial performance; and
  • make an assessment of the Group’s ability to continue as a going concern.

The Directors are responsible for keeping proper accounting records that are sufficient to show and explain the Group’s transactions and disclose with reasonable accuracy at any time its financial position of the Group to enable them ensure that the financial statements comply with the requirements of the Companies Act 2006. They have general responsibility for taking such steps as are reasonably open to them to safeguard the assets of the Group and to prevent and detect fraud and other irregularities.

The Directors are responsible for the maintenance and integrity of the corporate and Interim Financial Statements.  Legislation governing the preparation and dissemination of Interim Financial Statements may differ from one jurisdiction to another.

We confirm that to the best of our knowledge:

  • the Interim Financial Statements, prepared in accordance with International Financial Reporting Standards as adopted by the UK, give a true and fair view of the assets, liabilities, financial position and profit or loss of the Group for the period;
  • the Director’s report includes a fair review of the development and performance of the business and the position of the group, together with a description of the principal risks and uncertainties that they face; and
  • the annual report and financial statements, taken as a whole, are fair, balanced and understandable and provide the information necessary for shareholders to assess the group’s performance, business model and strategy.

 

Consolidated Statement of Comprehensive Income for the six month period ended 31 March 2023

  

6 months ended

31 Mar 2023

6 months ended

31 Mar 2022

  

(Unaudited)

(Unaudited)

(Audited)

 

Notes

GBP

GBP

GBP

  

 

 

 

Exploration costs

 

(16,642)

(2,744)

(4,853)

Impairment -Akelikongo project

 

(404,533)

Administrative fees and other expenses

5

(446,424)

(331,617)

(681,488)

Adjustments to Liability to surface liability

 

51,316

Operating loss

 

(463,066)

(334,361)

(1,039,558)

 

 

 

  

Finance costs

 

(23,010)

(21,975)

(45,916)

Loss before tax

 

(486,076)

(356,336)

(1,085,474)

 

 

 

  

Income tax

 

 

 

 

  

Loss after tax

 

(486,076)

(356,336)

(1,085,474)

 

 

 

 

 

Other comprehensive income

 

 

 

 

Exchange differences on translation of foreign operation

 

7,807

(2,061)

(4,205)

Other comprehensive income, net of tax

 

7,807

(2,061)

(4,205)

 

 

 

 

 

Total comprehensive loss

 

(478,269)

(358,397)

(1,089,679)

 

 

 

 

 

Basic and diluted loss per share (pence)

9

(0.28)

(0.27)

(0.68)

 

   There was no other comprehensive income for the period ended on 31 March 2023.

Consolidated Statement of Financial Position as at 31 March 2023

 

 

As at

31 Mar 2023

As at

31 Mar 2022

As at

30 Sept 2022

 

 

(Unaudited)

(Unaudited)

(Audited)

 

Notes

GBP

GBP

GBP

 

 

 

 

 

Non-Current Assets

 

7,065,820

5,815,114

6,615,253

 

 

 

 

 

Current assets

    

Trade and other receivables

6

135,901

248,413

85,847

Cash and cash equivalents

 

130,740

968,693

346,994

Total current assets

 

266,641

1,217,106

432,841

     

Total assets

 

7,332,461

7,032,220

7,048,094

     

Current liabilities

    

Creditors: Amounts falling due within one year

 

(429,843)

(282,217)

(326,375)

Total current liabilities

 

(429,843)

(282,217)

(326,375)

     

Non-current liabilities

    

Surface liabilities

 

(785,520)

(924,359)

(825,852)

     

Total liabilities

 

(1,215,363)

(1,206,576)

(1,152,227)

     

Net assets

 

6,117,098

5,825,644

5,897,867

     

Equity

    

Share capital

 

1,931,316

1,101,316

1,181,316

Share premium

 

7,428,329

6,841,596

7,480,829

Warrants reserves

 

402,148

317,876

402,148

Translation reserve

 

7,264

1,601

(543)

Retained earnings

 

(3,651,959)

(2,436,745)

(3,165,883)

Total equity

 

6,117,098

5,825,644

5,897,867

 

Consolidated Statement of Changes in Equity for the six month period ended 31 March 2023

 

Share capital

Share premium

Share option reserves

Retained earnings

Translation reserve

Total equity

 

GBP

GBP

GBP

GBP

GBP

GBP

Balance as at 30 Sep 2021

901,316

5,132,081

317,876

(2,080,409)

3,662

4,274,526

       

Total comprehensive loss for 6 months

 

 

 

 

 

 

Loss for the period

(356,336)

(356,336)

Total comprehensive loss

(356,336)

(356,336)

Contributions from equity holders

      

New shares issued

200,000

1,800,000

2,000,000

Share issue costs

(90,485)

(90,485)

Exchange differences on translation

   (2,061)

(2,061)

Total contributions from equity holders

200,000

1,709,515

(2,061)

1,907,454

       

Balance as at 31 Mar 2022

1,101,316

6,841,596

317,876

(2,436,745)

1,601

5,825,644

       

Total comprehensive loss for 6 months

 

 

 

 

 

 

Loss for the period

(729,138)

(729,138)

Total comprehensive loss

(729,138)

(729,138)

Contributions from equity holders

 

 

 

 

 

 

New shares issued

80,000

720,000

800,000

Share issue costs

(80,767)

(80,767)

Warrants reserve

  

84,272

84,272

Exchange differences on translation of foreign operations

(2,144)

(2,144)

Total contributions from equity holders

80,000

639,233

84,272

(729,138)

(2,144)

801,361

 

 

 

 

 

 

 

Balance as at 30 Sep 2022

1,181,316

7,480,829

402,148

(3,165,883)

(543)

5,897,867

 

Consolidated Statement of Changes in Equity for the six month period ended 31 March 2023

 

Share capital

Share premium

Share option reserves

Retained earnings

Translation reserve

Total equity

 

GBP

GBP

GBP

GBP

GBP

GBP

Balance as at 30 Sep 2022

1,181,316

7,480,829

402,148

(3,165,883)

(543)

5,897,867

 

 

 

 

 

 

 

Total comprehensive loss for 6 months

      

Loss for the period

(486,076)

(486,076)

Total comprehensive loss

(486,076)

(486,076)

Contributions from equity holders

 

 

 

 

 

 

New shares issued

750,000

750,000

Share issued costs

(52,500)

(52,500)

Exchange differences on translation of foreign operations

7,807

7,807

Total contributions from equity holders

750,000

(52,500)

7,807

705,307

       

Balance as at 31 Mar 2023

1,931,316

7,428,329

402,148

(3,651,959)

7,264

6,117,098

 

Consolidated Statement of Cash Flows for the six month period ended 31 March 2023

  

As at

31 Mar 2023

As at

31 Mar 2022

As at

30 Sept 2022

  

(Unaudited)

(Unaudited)

(Audited)

 

Notes

GBP

GBP

GBP

Operating activities

 

 

 

 

Loss after tax

 

(486,076)

(356,336)

(1,085,474)

Depreciation

 

104

Finance costs

 

23,010

21,974

45,916

Adjustment to Surface Liability

 

(51,316)

Share issue/warrant cost

 

84,272

Impairment – Akelikongo costs

 

404,533

Unrealised currency translation

 

261,566

(61,217)

(208,371)

Changes in working capital

    

Decrease/(increase) in trade and other receivables

 

(50,054)

(195,833)

(33,267)

Increase/(decrease) in trade and other payables

 

(39,568)

38,945

76,483

Net cash flows from operating activities

 

(291,018)

(552,467)

(767,224)

     

Cash flows from financing activities

    

Purchase of fixed assets

 

(748)

Investment in exploration assets

 

(621,988)

(481,643)

(1,423,236)

Net cash flows from investment activities

 

(622,736)

(481,643)

(1,423,236)

     

Financing activities

 

   

Shares issued

 

750,000

2,000,000

Shares issued (cost)

 

(52,500)

(90,486)

2,444,166

Net cash flows from financing activities

 

697,500

1,909,514

2,444,166

     

Increase in cash and short-term deposits

 

(216,254)

875,404

253,706

     

Cash and short-term deposits brought forward

 

346,994

93,288

93,288

     

Cash and cash equivalents at end of period

 

130,740

968,692

346,994

Notes to the Financial Statements for the six month period ended 31 March 2023

 

1.   General

Blencowe Resources Plc (the “Company”) is a public limited company incorporated and registered in England and Wales on 18 September 2017 with registered company number 10966847 and its registered office situated in England and Wales at 167-169 Great Portland Street, Fifth Floor, London, England W1W 5PF.

The Group did not earn any trading income during the period under review but incurred expenditure in developing its principal assets.

The Consolidated Interim Financial Statements of the Company for the six month period ended 31 March 2023 comprise the financial statements of the Company and its subsidiaries (together referred to as the “Group”).

2.   Accounting Policies
Basis of preparation

The Interim Financial Statements of the Group are unaudited condensed financial statements for the six month period ended 31 March 2023.

The accounting policies applied by the Group in these Interim Financial Statements, are the same as those applied by the Group in its consolidated financial statements and have been prepared on the basis of the accounting policies applied for the financial year to 30 September 2022 which have been prepared in accordance with IFRS as adopted by UK for. The Group Financial Statements have been prepared using the measurement bases specified by IFRS each type of asset, liability, income and expense.

The Group Financial Statements are presented in £, which is the Group’s functional currency. All amounts have been rounded to the nearest pound, unless otherwise stated.

Comparative figures

The comparative figures have been presented as the Group Financial Statements cover the 6 month period ended 31 March 2022 and the 12 month period ended 30 September 2022.

3.   Critical accounting estimates and judgments

In preparing the Group’s Interim Financial Statements, the Directors have to make judgments on how to apply the Group’s accounting policies and make estimates about the future. The Directors do not consider there to be any critical judgments that have been made in arriving at the amounts recognised in the Group Financial Statements.

4.   Significant accounting policies

The accounting policies adopted are consistent with those followed in the preparation of the annual financial statements of Blencowe Resources Plc for the year ended 30 September 2022.  A copy of these financial statements is available on the Group website at https://blencoweresourcesplc.com/

5.   Administrative fee and other expenses

 

6 months ended

 31 Mar 2023

6 months ended

31 Mar 2022

12 Months ended

30 Sep 2022

 

(Unaudited)

(Unaudited)

(Audited)

 

GBP

GBP

GBP

Directors’ remuneration

70,023

70,046

173,413

Professional fees

121,692

130,655

274,333

Salaries

75,000

60,000

142,500

Listing fees

18,218

19,783

26,910

Audit fees

21,644

4,375

29,000

Share issue/warrant cost

84,272

Administration fees

23,500

23,500

47,000

Broker fees

20,500

29,542

38,048

Travelling expenses

7,959

34,167

Miscellaneous fees

87,888

(6,284)

(168,155)

Total

446,424

331,617

681,488

 

The Group had two employees who are key management personnel and three Directors. The Directors and the key management personnel’s remuneration related solely to short term employee benefits.

6.   Trade and other receivables

 

6 months ended

 31 Mar 2023

6 months ended

31 Mar 2022

12 Months ended

30 Sep 2022

 

(Unaudited)

(Unaudited)

(Audited)

 

GBP

GBP

GBP

Other receivables

21,526

37,997

24,765

Prepayments

114,375

210,416

61,082

Total

135,901

248,413

85,847

7.   Creditors: Amounts falling due within one year

 

6 months ended

 31 Mar 2023

6 months ended

31 Mar 2022

12 Months ended

30 Sep 2022

 

(Unaudited)

(Unaudited)

(Audited)

 

GBP

GBP

GBP

Payables

118,980

268,067

140,018

Land Owners Liability

143,036

154,403

Accruals and provision

167,827

14,150

31,954

Total

429,843

282,217

326,375

8.   Creditors: Amounts falling after one year

BRUL, the Company’s subsidiary entered into an agreement for surface rights over the land in the mineral area of the licence. The land owners granted BRUL a 49 year lease over an area. The liability to the land owners is to be paid in 8 instalments on at defined dates with the final payment due in 2035.

 

6 months ended

 31 Mar 2023

6 months ended

31 Mar 2022

12 Months ended

30 Sep 2022

 

(Unaudited)

(Unaudited)

(Audited)

 

GBP

GBP

GBP

Total payable at the beginning of the period

978,255

887,560

887,560

Change in estimate

(51,316)

Interest charged during the period

23,010

21,975

45,916

Exchange loss on valuation

(72,709)

14,824

96,095

Total payable as at period end

928,556

924,359

978,255

 

 

 

 

Analysis between current and non-current liability

 

 

 

Payable within 12 months

143,036

154,403

Payable after 12 months

785,520

924,359

823,852

 

928,556

924,359

978,255

 

The value of the lease is measured at the present value of the contractual payments due to the lessor

over the lease term, with the discount rate of 5%.

9.   Loss per share

The calculation of the basic and diluted loss per share is based on the following data:

 

6 months ended

 31 Mar 2023

6 months ended

31 Mar 2022

12 Months ended

30 Sep 2022

 

(Unaudited)

(Unaudited)

(Audited)

Earnings

GBP

GBP

GBP

Loss from continuing operations for the period attributable to the equity holders of the Group

(478,269)

(353,336)

(1,085,474)

Number of shares

   

Weighted average number of Ordinary Shares for the purpose of basic and diluted earnings per share

   

168,803,923

133,655,997

160,790,224

Basic and diluted loss per share (pence)

(0.28)

(0.27)

(0.68)

 

There are no potentially dilutive shares in issue.

10. Related party transactions

The are no related party transactions during the period except for the Directors’ remuneration, which have been disclosed in note 5.

 

Sam Quinn is a director and shareholder of the Company and a Director of Lionshead Consultants Limited.  During the period, Lionshead Consultants Limited charged fees for consultancy fees of £18,000 (31 March 2022: £12,000 and 30 Sep 2022: £24,000).

11. Events after the reporting date

On 27 April 2023, the Company announced that it has managed to secure a strategic funding partner for the Orom-cross graphite project. The Development Finance Corporation engaged to fund 50% of the definitive feasibility study costs by way of a technical assistant grant. The DFC is the primary US Government finance institution set up to provide financially sound solutions for private sector initiatives pertaining to critical challenges facing the world.

 

On 18 May 2023 Blencowe Resources Plc announced that it had raised £635,000 at 5 pence per share through the issue of 12,700,000 new ordinary shares of 0.5p placing shares. The Company will issue investors in the Placing with 1 warrant per 2 Placing Shares (Investor Warrants”) which are exercisable at 8p for a period of 3 years from Admission of the Placing Shares.