Corporate Presentation

22.09.2023.

Blencowe Resources is pleased to announce the release of an updated presentation following the completion of the DFC grant.

The presentation can be viewed here and can be found on the Company’s website at https://blencoweresourcesplc.com/presentation/

For further information, please contact:

Blencowe Resources Plc

Sam Quinn (London Director) 

www.blencoweresourcesplc.com

[email protected]

+44 (0)1624 681 250

Investor Enquiries

Sasha Sethi

Tel: +44 (0) 7891 677 441

[email protected] 

Tavira Financial

Jonathan Evans

Tel: +44 (0)20 7100 5100 

[email protected]

First Equity Limited

Jason Robertson

Tel: +44 (0)20 7330 1883

[email protected]

Twitter https://twitter.com/BlencoweRes
LinkedIn https://www.linkedin.com/company/blencowe-resources/

Sign up for our news: http://eepurl.com/hxc9vn 

 

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit. A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe has moved into the Definitive Feasibility Study phase as it drives towards first production. Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.