Result of Retail Offer

16 April 2025 

THIS ANNOUNCEMENT, INCLUDING THE INFORMATION CONTAINED HEREIN, IS RESTRICTED AND IS NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY, IN, INTO OR FROM THE UNITED STATES, CANADA, JAPAN, AUSTRALIA, NEW ZEALAND, THE REPUBLIC OF SOUTH AFRICA, THE REPUBLIC OF IRELAND OR ANY OTHER JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OR REGULATIONS OF THAT JURISDICTION. PLEASE SEE THE IMPORTANT NOTICES AT THE END OF THIS ANNOUNCEMENT.

 

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF THE MARKET ABUSE REGULATION (EU) 596 / 2014 WHICH FORMS PART OF UK LAW BY VIRTUE OF THE EUROPEAN UNION (WITHDRAWAL) ACT 2018 (“MAR”). IN ADDITION, MARKET SOUNDINGS (AS DEFINED IN MAR) WERE TAKEN IN RESPECT OF CERTAIN OF THE MATTERS CONTAINED IN THIS ANNOUNCEMENT, WITH THE RESULT THAT CERTAIN PERSONS BECAME AWARE OF SUCH INSIDE INFORMATION, AS PERMITTED BY MAR. UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN AND SUCH PERSONS SHALL THEREFORE CEASE TO BE IN POSSESSION OF INSIDE INFORMATION. 

 16 April 2025

Blencowe Resources plc (the “Company”)

Result of Retail Offer

 

The Board of Blencowe Resources plc announces that the Retail Offer launched on 15 April 2025 has now closed and has raised £86,961.87 through the issue of 2,898,729 Retail Offer Shares at a price of 3 pence each.

Admission to Trading

Application will be made for 2,898,729 Retail Offer Shares and the 33,333,334 Placing Shares resulting in an aggregate of 36,232,063 new ordinary shares to be admitted to trading on the Equity Shares (Transition) category of the official list and the main market of the London Stock Exchange from 8.00 a.m. on 24 April 2025. These new ordinary shares will rank pari passu with the Existing Ordinary Shares.

Total Voting Rights

 In accordance with the FCA’s Disclosure Guidance and Transparency Rules, the Company confirms that following Admission of the Placing Shares and Retail Offer Shares, the Company’s enlarged issued ordinary share capital will comprise 328,308,683 Ordinary Shares. The Company does not hold any Ordinary Shares in Treasury. Therefore, following Admission, the above figure may be used by shareholders in the Company as the denominator for the calculations to determine if they are required to notify their interest in, or a change to their interest in the Company, under the FCA’s Disclosure Guidance and Transparency Rules.

Unless otherwise defined, all capitalised terms used but not defined in this announcement shall have the meaning given to them in the announcement of the Placing made by the Company on 15 April 2025.

For further information please contact:

 

Blencowe Resources Plc

Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

[email protected]

 

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

[email protected]

 

Tavira Financial – Financial Adviser & Broker

Jonathan Evans

Tel: +44 (0)20 3192 1733

[email protected]

 

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

 

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger coarse flakes within the deposit.

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit.  Blencowe completed a successful Pre-Feasibility Study on the Project in July 2022 and is now within the Definitive Feasibility Study phase as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with an initial JORC Indicated & Inferred Mineral Resource of 24.5Mt @ 6.0% TGC (Total Graphite Content). This Resource has been defined from only ~2% of the total tenement area which presents considerable upside potential ahead.  Development of the resource is expected to benefit from a low strip ratio and free dig operations together with abundant inexpensive hydro-electric power off the national grid, thereby ensuring low operating costs.  With all major infrastructure available at or near to site the capital costs will also be relatively low in comparison to most graphite peers.

In 3Q 2024 Blencowe introduced a Joint Venture concept with experienced downstream graphite processing partners to ultimately produce upgraded 99.95% SPG in Uganda.  This strategy has several key advantages plus substantial cost savings which will assist deliver a world class project once DFS is completed.