Appointment of Leading Engineering Firm to Manage Orom-Cross DFS
23 Jan 2023
Blencowe Resources Plc
(“Blencowe” or the “Company“)
Highlights
- Blencowe continues to progress the Orom-Cross project with appointment of a notable engineering firm to manage the Definitive Feasibility Study (“DFS”).
- Appointment of CPC Engineering (“CPC”) of Perth to lead and develop the DFS for Orom-Cross.
- CPC have extensive experience in African graphite projects and Blencowe will leverage this knowledge to refine the delivery of the Orom-Cross DFS.
Blencowe Resources Plc (“Blencowe Resources” or the “Company”) (LSE: BRES) is pleased to announce it has engaged leading engineering firm CPC Engineering to lead, deliver and sign off on the DFS for the Orom-Cross Graphite Project.
CPC has extensive experience in other leading graphite projects in East Africa, having completed the DFS for the Maniry Graphite Project (Black Earth Minerals, ASX: BEM) in Madagascar, as well as both the Mahenge (Black Rock Mining Ltd, ASX: BKT) and Chilalo Graphite (Evolution Energy Minerals, ASX: EV1) Projects in Tanzania and the scoping study for the Ancuabe Graphite Project (Triton Minerals, ASX: TON) in Mozambique. CPC also completed the detailed engineering, procurement, construction support and commissioning services for the Syrah Resources (ASX: SYR) Balama Graphite Project in Mozambique.
Blencowe is pleased to have partnered with a firm with extensive experience in both graphite and flotation circuits. CPC will work with the Company and various other Ugandan service providers in the delivery of the DFS for Orom-Cross Graphite in 2023.
The CPC works will include:
- Optimisation of the process plant design, incorporating results of the various testwork programs from SGS, IMO and the pilot plant works (Jilin/China) along with CPC’s expertise in design and construction of graphite process plants.
- Provide updated and optimised CAPEX and OPEX for project cost and schedule certainty;
- Provide updated project costs and schedule for the Project non-processing Infrastructure.
- Sign off on full DFS once completed to provide the third party approval from a recognised leading technical firm as required to ensure project funding support.
Cameron Pearce, Executive Chairman commented;
“We are pleased to add another high-quality partner to the Orom-Cross Project. CPC has a very impressive track record within the graphite market and we are now able to leverage off their skills, experience and relationships to ensure we deliver a first class DFS.”
He continued “The graphite market continues to shift in our favour and we expect the supply-demand imbalance to widen further, as demand for graphite accelerates, given its material role within lithium-ion batteries. Orom-Cross has continued to exceed our expectations and we remain focused on delivering a world class project. CPC are recognised as one of the top tier engineering firms within the graphite sector and their sign off on the DFS will not only help optimise the Project, but also provide the credibility required for project funding and market support.”
For further information, please contact:
Blencowe Resources Sam Quinn | Tel: +44 (0) 1624 681 250 |
Investor Enquiries Sasha Sethi | Tel: +44 (0) 7891 677 441 |
Tavira Securities Limited Jonathan Evans | Tel: +44 (0)20 7100 5100 |
First Equity Limited Jason Robertson | Tel: +44(0)20 7330 1833 |
Twitter https://twitter.com/BlencoweRes
LinkedIn https://www.linkedin.com/company/blencowe-resources/
Sign up for our news: http://eepurl.com/hxc9vn
Background
Orom-Cross Graphite Project
Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger coarse flakes within the deposit.
A 21-year Mining Licence for the Project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe completed a successful Pre-Feasibility Study in 2022. The Company has now moved into the Definitive Feasibility Study phase as it drives towards first production.
Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content, with only a small percentage of the overall deposit drilled to date. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.